Difference between revisions of "MicroHydro"

From Kelabit Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
== Project Summary ==
 
== Project Summary ==
  
http://kelabit.net/bariohydro/images_/gallery/kerjasama_01/03_b.jpg
+
[[Image:Lraja bariohydro.jpg|thumb|250px|Project Manager? <br> Photo downloaded from [http://kelabit.net/bariohydro/index.htm project website] ]]
  
The residents of [[Bario Asal]] longhouse and adjoining [[Arur Layun]] village intend to install a micro-hydro system capable of producing a minimum of 10 kW of electricity on the [[Pa Merario]] River. The micro-hydro system will replace the current diesel generator which runs for only 3 hours each night and costs residents RM 900.00 per month.  
+
The residents of [[Bario Asal]] longhouse and adjoining [[Arur Layun]] village intend to install a micro-hydro system capable of producing a minimum of 10 kW of electricity on the [[Pa' Merariu]] River. The micro-hydro system will replace the current diesel generator which runs for only 3 hours each night and costs residents RM 900.00 per month.  
  
 
It will provide the 47 houses in [[Bario Asal]] and [[Arur Layun]], and the village church with a constant supply of clean, renewable energy at a fraction of the cost of diesel power. Residents will finally be able to enjoy indoor lighting and some of the basic amenities most of us take for granted.
 
It will provide the 47 houses in [[Bario Asal]] and [[Arur Layun]], and the village church with a constant supply of clean, renewable energy at a fraction of the cost of diesel power. Residents will finally be able to enjoy indoor lighting and some of the basic amenities most of us take for granted.
  
 
== Reference Link ==
 
== Reference Link ==
http://kelabit.net/bariohydro/index.htm [http://kelabit.net/bariohydro/index.htm]
+
[http://kelabit.net/bariohydro/index.htm http://kelabit.net/bariohydro/index.htm]
  
 
[[Category:Community Project| Microhydro ]]
 
[[Category:Community Project| Microhydro ]]

Latest revision as of 17:33, 1 December 2007

Project Summary

Project Manager?
Photo downloaded from project website

The residents of Bario Asal longhouse and adjoining Arur Layun village intend to install a micro-hydro system capable of producing a minimum of 10 kW of electricity on the Pa' Merariu River. The micro-hydro system will replace the current diesel generator which runs for only 3 hours each night and costs residents RM 900.00 per month.

It will provide the 47 houses in Bario Asal and Arur Layun, and the village church with a constant supply of clean, renewable energy at a fraction of the cost of diesel power. Residents will finally be able to enjoy indoor lighting and some of the basic amenities most of us take for granted.

Reference Link