Difference between revisions of "MicroHydro"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
[[Category:Community Project|Microhydro ]] | [[Category:Community Project|Microhydro ]] | ||
− | [[Category:Bario Asal| | + | [[Category:Technology|Microhydro ]] |
− | [[Category:Arur Layun| | + | [[Category:Bario Asal|Microhydro ]] |
− | [[Category:2006| | + | [[Category:Arur Layun|Microhydro ]] |
+ | [[Category:2006|Microhydro ]] |
Revision as of 23:30, 30 July 2007
Project Summary
http://kelabit.net/bariohydro/images_/gallery/kerjasama_01/03_b.jpg
The residents of Bario Asal longhouse and adjoining Arur Layun village intend to install a micro-hydro system capable of producing a minimum of 10 kW of electricity on the Pa Merario River. The micro-hydro system will replace the current diesel generator which runs for only 3 hours each night and costs residents RM 900.00 per month.
It will provide the 47 houses in Bario Asal and Arur Layun, and the village church with a constant supply of clean, renewable energy at a fraction of the cost of diesel power. Residents will finally be able to enjoy indoor lighting and some of the basic amenities most of us take for granted.